The registered customer must sign a Letter of Indemnity, affixed with Stamp Duty (RM10.00 per contract). It is applicable to all overhead and underground systems up to 33kV. They can do so by contacting Sarawak Energy’s customer care centre at 1300-88-3111 or email at customercare@sarawakenergy.com. Sarawak Energy serves over 600,000 customers across the Malaysian state of Sarawak. In this case, the application procedure is the same as with a normal application; customers must submit their Application Form (AC01) through SESCO-registered Electrical Installation Contractors (EIC) or Electrical Consultants, and attach required supporting documents to SESCO. Read how Sarawak Energy deployed the SAP Moving Assets solution to help it gain a complete view of fleet usage. Aside from SEB cares, payment of bills can also be conducted through other platforms such as online banking via JomPay and e-Wallets like Sarawak Pay and Boost as well as online shopping platforms such as Lazada and Shopee. “This includes controlling the number of customers inside the customer service centre and thermal scanning of customers entering the premises,” the statement said. If the meter is accurate, a meter testing fee of RM10.00 will be charged. KUCHING: Sarawak Energy will be resuming its customer service counter operations, meter reading and bill delivery services starting tomorrow (May 12), in line with the government’s Conditional Movement Control Order (CMCO) directive. Work is still efficient" Payment kiosks located in Kuching (Saradise), Bintulu and Miri customer service centres continue to be in operation from 7am to 7pm daily. The methodology is then further classified into Normal (SESCO) Project or Turnkey Project. The duration of temporary supply for internal wiring inspection and testing purposes is defaulted to 1 month from the date of energization of electricity supply. Please click here to download the contractor list. The Connection Charging Methodology is based on the classification of the premises into one of the four (4) categories: Category 2 – Housing and Shophouse Developments, Category 3 – Other Individual and Development. For each request, a photocopy of the NRIC must be submitted together with either a contact number or a postal address. Customer Service Counter. For a Normal Project, the connection charges may consist of Per House Fee, Installation and Material Costs, Capacity Charges and Meter Fee where applicable. To make a new application for electricity supply, we advise you to hire a registered contractor, who will assist you with your application.You will require the following documents for your application: To terminate an existing account, you must surrender your original deposit. For further enquiries, customers can contact Sarawak Energy’s customer care centre at 1300-88-3111 or email at customercare@sarawakenergy.com. Sarawak Energy’s 24/7 Customer Service Centre operates at two sites- Kuching and Miri to handle enquiries on technical and customer services. To avoid conducting or to minimise face to face transactions, customers were also encouraged to continue to use SEB cares, Sarawak Energy’s online application for tracking and payment of bills as well as for other online functions. Permanent premises such as large commercial centres, high-rise buildings (offices, hotels, condominiums, etc.) Stay home to help break the COVID-19 transmission in Sarawak. Temporary supply will be given after internal wiring testing results are submitted to and accepted by SESCO. If the customer wishes to submit a claim that the meter has been lost, burnt or damaged, a police report must be obtained to support the claim. The contract account number will be required. Monday - Friday. Search and apply for the latest Customer service executive jobs in Bintulu, Sarawak. You may approach any of our Customer Service Counter or contact our Customer Care Centre to submit the following documents: DISCONNECTIONPlease walk-in to any one of our Customer Service Counter, or contact our Customer Care Centre, to request for a disconnection.The following documents will be required: RECONNECTIONYou can request for a reconnection at any one of our Customer Service Counter, or by contacting our Customer Care Centre.Note: Please engage one of our registered internal wiring contractors and submit the following documents to our Customer Service Counter: There are two scenarios in which you might apply for temporary electricity supply: 1. All information will be kept strictly confidential. The Company is fully owned by the Government of Malaysia. 8:30 a.m. - 4:00 p.m. 8:30 a.m. - 4:00 p.m. I have recommended Sarawak Energy Berhad to my friends and family in the past." Sort by: relevance - date. Sarawak Energy customer service counter, meter reading, bill delivery services to resume May 12 KUCHING: Sarawak Energy will be resuming its customer service counter operations, meter reading and bill delivery services starting tomorrow (May 12), in line with the government s Conditional Movement Control Order (CMCO) directive. The amount chargeable is based on the Schedule of Rate published in the guidelines and Least Cost Technical Design (LCTD). The contract validity period, as well as the duration of temporary supply, will follow these conditions:  Customer service counters at main stations in Kuching, Sri Aman, Sibu, Sarikei, Miri, Bintulu and Limbang will be operating from 8.30am to 4.00pm while other stations will be operating from 8.00am to 12noon daily. Any request on behalf of a registered owner who is deceased, a Statutory Declaration and Letter of Administration must be provided. 2. They are a governmental organization solely focused on providing electric to millions of Sarawak residents. We have also increased our touch-points to ensure that the customers are able to reach us via various mediums. The Company is the main supplier of … When requesting for termination of supply and a Collateral Deposit refund, please provide the following supporting documents: 2021 © SARAWAK ENERGY. “Sarawak Energy will exercise precautionary health measures in resuming the services and operation in accordance with government and company standard operating procedures. This service is available on the web, iOS, Android, and Windows Phone platforms. b. Customers entering Sarawak Energy premises are advised wear face masks and comply with the Standard Operating Procedures (SOP). You are required to change the name on the contract as soon as you buy or rent the premises. This service is available on the web, iOS, Android, and Windows Phone platforms. Sarawak Energy serves over 600,000 customers across the Malaysian state of Sarawak. Payment Counter. Sarawak Energy Berhad Contact Phone Number is : 1300-88-3111, Fax : +6 082-344433 and Address is Sarawak Energy Berhad, Menara Sarawak Energy, No. 32 Views • 23/09/2020 • Knowledge How can I calculate my home electricity consumption? REGISTER OR RENEW AS AN INTERNAL WIRING CONTRACTOR. Sarawak Energy Berhad is an energy development company and a vertically integrated power utility with a vision to achieve sustainable growth and prosperity for Sarawak by meeting the region’s need for reliable and renewable energy—providing electricity to 3 million Sarawakians in urban and rural areas. With immediate effect, our Miri customer service counter at Permy Jaya is now closed until Friday, 15 January 2021 for sanitisation and fumigation works as a safety precaution to reduce any potential spread of the COVID-19 infection. According to … Alternatively, you can contact us via email at customercare@sarawakenergy.com. View 8 Sarawak Energy jobs at Jora, create free email alerts and never miss another career opportunity again. Maximum 1 year for showroom or show house. KUCHING, Jan 11: Sarawak Energy’s customer service counter at Permyjaya in Miri is closed with immediate effect until Friday (Jan 15) as a safety … Where the customer and/ or local authorities requires and/ or requests implementation of additional features (Enhanced Scheme), the additional cost incurred shall be borne by the customer. Subject to the conditions as stipulated in the Connection Charges Guideline, customers can request for a refund of the following: Value of removed transformer for turnkey project, Value of removed equipment for temporary supply, 50% of contribution for development of 33kV Asset. Your registered Email Address will be used as your User ID every time you log in to eCX. Free, fast and easy way find a job of 28.000+ postings in Bintulu, Sarawak and other big cities in Malaysia. Sarawak Energy is a vertically integrated energy development company and power utility that has a vision: it wants to achieve sustainable growth and promote prosperity for the Malaysian state of Sarawak, meeting its reliable, renewable energy needs. For more information, customers and eligible account holders can contact Sarawak Energy Customer Care Centre at 1300-88-3111 or refer to https://www.sarawakenergy.com/media-info/announcements-publications/announcement-economic-stimulus-package-sarawak-electricity-bill … You must provide safe access to the meter so that our technician can obtain the last meter reading and inspect the meter before disconnection. The application does not require the submission of an Occupation Permit (OP) or any letter of consent from Counsils. For a Turnkey Project, the connection charges may consist of Administration Fee, Testing Fee, Capacity Charges, Controlled Items and Meter Fee where applicable. The amount after the revision may vary depending on the published Schedule of Rates on the day of calculation. A meter will be installed to measure electricity consumption during the given period of temporary supply. If you wish to conduct Internal Wiring Testing on your premises, please contact any of our authorised-to-test, registered Internal Wiring Contractors. Contributions to community halls and religious premises are subject to eligibility criteria as stated in Sarawak Energy’s policy. Hand sanitisers will be provided at the centre. iSentric helped Sarawak Energy to launch their all new, omni channel customer service platform - SEB cares. Please ensure that all entered details are valid and complete for our approval. Customer Service Counter staff must ensure that the relevant premises are stated clearly in the LOA. Sibu. Sarawak Energy is the electric utility company of the Malaysian state of Sarawak. The customer must sign an 'Undertaking Letter for Temporary Electricity Supply' to agree that, should the Council make a later decision that the temporary premises are illegal, the signed 'Contract for Supply of Electricity' shall be null and void, and the temporary supply will be disconnected. A LOA must be produced by a representative, for legal beneficiary verification. The request form can only be signed by the registered customer. Please contact our Customer Care Centre or walk-in to one of our Customer Service Counters to request for a meter testing. The report contains a detailed SWOT analysis, information on the company’s key employees, … To apply for temporary supply to permanent buildings for internal wiring inspection and testing, SESCO-registered Electrical Installation Contractors (EIC) or Electrical Consultants must sign and submit the 'Undertaking Letter for Temporary Supply for Internal Wiring Installation Testing' (Form CCS/A20) to SESCO. All other relevant requirements and charges must be duly completed and paid prior to energizing or connecting the electricity supply. Maximum 3 years for site office or temporary structure. KUCHING: Sarawak Energy’s customer care and support is adapting to the new normal with its utility and retail arm by stepping up digitally to maintain consistent customer care service during the Movement Control Order (MCO). Learn how this has helped the company improve fleet-management productivity, optimize fleet maintenance, and encourage safer driving. Sarawak Energy is a Malaysian energy company based out of Kuching, Sarawak, responsible for generating, transmitting, and distributing electricity in the state of Sarawak, Malaysia. For any enquiries, please contact our Customer Care Centre at 1300-88-3111 or email us at ecx.support@sarawakenergy.com, Register as an Electrical Installation Contractor. Sarawak Energy’s 24/7 Customer Service Centre operates at two sites- Kuching and Miri to handle enquiries on technical and customer services. Our customer, a global leader in touchscreen solutions, is looking for an Inside Sales Representative Benelux/France responsible for all duties from prospecting to closing accounts in collaboration with the field sales / channel sales team for the region(s) they support.. For further enquiries, customers can contact Sarawak Energy’s customer care centre at 1300-88-3111 or email at [email protected], Sarawak Energy customer service counter, meter reading, bill delivery services to resume May 12, Why give up S’wak oil and gas rights in settlement with Petronas, PSB asks GPS, MEDAC to simplify loan procedures for entrepreneurs. This list was last updated on  16 July 2019. The 'Contract for Supply of Electricity' must be signed by the customer and by SESCO. Ng said customers could submit the photographs of their meter reading either to the nearest SEB customer care centres, via email to customercare@sarawakenergy.com, their mobile App, SEB Cares, which is available on Google Play Store, Apple App Store or https://sebcares. On this page, you can find retail counters near you or learn more about our available services below. Customers will receive monthly energy bills as usual. Customer Service. Sarawak Energy Berhad is a fully integrated energy utility company that generates, transmits, and distributes energy in Sarawak, in hopes of achieving sustainable growth for the state. All connection charge bill must be paid on or before the payment due date; failing which, the bill will not be accepted for payment and the amount will be subject to revision. The temporary supply application does not require the submission of an Occupation Permit (OP) or any letter of consent from Councils. Customer Service jobs in Sarawak. Connection Charges are valid for a period of six (6) months from the release date. Discounted Meter Fee of RM70 and waiver of Capacity Charges for the following (with an applied load not exceeding 2kVA per unit): Residential houses built under relevant Government assisted scheme. We have also increased our touch-points to ensure that the customers are able to reach us via various mediums. To request for a reconnection, payment for any outstanding bills must be made before 3pm on that day, and proof of payment must be provided if the payment was not made at the Customer Service Counter. Contractors who wish to renew or register as one of our internal wiring contractors are required to do so at our online registration portal, eCustomer Experience (eCX). The registered customer's details (such as name or NRIC number) registered in the SAP do not match the details in his/her NRIC. Temporary premises such as site offices, showrooms, or show houses, where electricity is required to operate and there is no permanent connection to the premises. Circular: Standardisation of Rate for Collateral Deposit Charges, Checklist: Supporting Documents for Temporary Supply, Form: Registration as a SESCO Registered Electrical Installation Contractor, Form: Registration as a SESCO Registered Electrical Installation Contractor (for existing SESCO-Registered Electrical Installation Contractos), Checklist: Documents for Registration/Renewal as Electrical Installation Contractor, Collateral Deposit charges are standardised to a flat rate based on the type of premises, type of meter, and type of ownership of the premises. Availability. The Company generates, transmits, and distributes electricity power through hydro, coal and gas. ALL RIGHTS RESERVED. "Over the last 10 years, the growth in Sarawak Energy has been tremendous," says James Ung, CEO of SEB Power, one of three divisions of Sarawak Energy Berhad. The ‘SEB cares’ mobile app can be downloaded in Play Store or App Store or here for matters on billing and meter reading, bill payments and reporting of any technical issues. A Connection Charge is the amount to be paid by a customer who requires a new connection or a change in their electricity supply. How do I … Sarawak Energy Berhad is an energy development company. At the landing page, click ‘I Want To Register’ link and choose ‘Contractor’ button. Letter of Administration (LOA) if the registered customer is deceased; produced by the representative. You are advised to set an appointment for the disconnection. Installation Cost capped at RM 500 (excluding meter fee) for Category 1 (Individual (Residential)) applicants for work scope involving: Single phase service line with/ without belian riser only, Built up area not exceeding 755sq-ft (based on the size of Spektra Medium or any such requirements as declared by the Authorities). Sarawak Energy Berhad - Strategic SWOT Analysis Review provides a comprehensive insight into the company’s history, corporate strategy, business structure and operations. Page 1 of 81 jobs. This must be duly completed and signed by new customers who wish to retain and use the existing meters. AC01 Application Form (to be filled by customer or contractor), Land Title / Tenancy Agreement / Sales & Purchase Agreement, Copy of NRIC (For companies, please provide copy of the Director's IC), Trade License, Form 44 and Form 49 (for companies), Land Title / Sales & Purchase Agreement / Memorandum of Transfer. For Collateral Deposits that exceed RM5,000, customers may opt to provide security in the form of a banker's guarantee. In any other complex cases, or if the particulars do not match against the record, a Statutory Declaration is required. and housing developments, for the purposes of inspection and testing of internal wiring—not for commercial operation.TEMPORARY SUPPLY TO TEMPORARY PREMISES, TEMPORARY SUPPLY TO PERMANENT PREMISES FOR INTERNAL WIRING INSPECTION AND TESTING PURPOSES. Verified employers. Once approved, you may view and renew your registration online to stay as our active contractor. For Collateral Deposits below RM5,000, payment shall be made in cash or credit. Head Office: 8th Floor Sarawak Energy Berhad, Wisma SEB, No.1, The Isthmus, 93050 Kuching, Sarawak. iSentric helped Sarawak Energy to launch their all new, omni channel customer service platform - SEB cares. All relevant charges such as Connection Charge and Collateral Deposit must be pair prior to meter installation. You are also required to settle any outstanding bills. During this period, contractors will have ample time to carry out site inspection with local authorities, utility agencies, and Jabatan Bomba—in order to obtain an Occupation Permit for the premises. I called the customer service line, and the representative was helpful and friendly. Urban Transformation Centre (UTC) at Taman Kereta, UTC Miri at Pejabat Majlis Bandaraya Miri, Registered Sales & Purchase Agreement / Land Title / Tenancy Agreement / Offer Letter Memorandum of Transfer (wherever applicable), Business Registration Document (if registered under a company name), Company stamp (if registered under a company name), You can also apply for new application for electricity supply online. Indeed may be compensated by these employers, helping keep Indeed free for jobseekers. It is one of Malaysia's three electrical companies, the other two being Tenaga Nasional, supplying the Federation of Malaya, and Sabah Electricity, which serves the state of Sabah and Labuan History. Operating hours. Sarawak Energy Berhad, which powers the region, has recorded a growth rate of more than double that. You may engage any of our registered internal wiring contractors to administer the testing. Sarawak Energy’s customer service counter at Permyjaya in Miri is closed with immediate effect until Friday (Jan 15) as a safety precaution after one of its staff was identified as a close contact of a Covid-19 positive case today. For premises that have been vacant for more than one year, you are required to do an internal wiring testing. Displayed here are Job Ads that match your query. The customer or a representative must be on site during disconnection. Regional Office, Jalan Deshon. The meter is installed to measure the electricity consumption. See 2 photos and 1 tip from 176 visitors to Sarawak Energy Berhad - Customer Service. How can I request for vegetation clearing? Statutory Declaration (or Surat Akaun) – can be made at the Commissioner of Oath office or District Office, and must be produced if: The registered customer is deceased and the LOA is not available. sarawakenergy.com.my. Please refer to the checklist of standard required supporting documents. a. Where can I pay my bills other than going to Sarawak Energy customer service counters? "Altho its lunch time. In a statement today, the utilities company said that the aforementioned services had stopped in mid-March, following the implementation of the first phase of the Movement Control Order (MCO). Where can I pay my bills other than going to Sarawak Energy customer service counters? Where can I find Sarawak Energy payment counters? View the Collateral Deposit Rates table. For accounts registered under a company's name, an employee must sign on behalf of the company and present his/her NRIC. The name stated in the NRIC must match with the registered customer's name in the SAP. SEB Power owns and operates the group's coal, gas and hydropower generation assets. KUCHING: Sarawak Energy Bhd (SEB) through its Customer Care Centre (CCC) will introduce its own mobile application for convenience of customers. 1, The Isthmus, 93050 Kuching, Sarawak, Malaysia Sarawak Energy Berhad is a power generating Company based in Sarawak, Malaysia. Supply of electricity ' must be on site during disconnection Charge and Collateral Deposit refund please... Electricity power through hydro, coal and gas on providing electric to millions of Sarawak residents growth rate of than. You may engage any of our authorised-to-test, registered internal wiring testing results are submitted and... Of standard required supporting documents Register ’ link and choose ‘ Contractor ’ button published! Match with the standard operating procedures site during disconnection settle any outstanding bills region, has recorded a growth of. Are subject to eligibility criteria as stated in the guidelines and Least Cost technical Design ( )... These conditions: a particulars do not match against the record, Statutory... Are valid and complete for our approval reach us via various mediums or credit can! Where can I calculate my home electricity consumption during the given period of temporary supply testing on premises! About our available services below or learn more about our available services below chargeable. And family in the guidelines and Least Cost technical Design ( LCTD ) Statutory is. A registered owner who is deceased sarawak energy customer service a Statutory Declaration is required touch-points ensure... Bills other than going to Sarawak Energy Berhad - customer service Centre operates at two Kuching. Deceased ; produced by a representative must be submitted together with either a contact number or a,! Meter so that our technician can obtain the last meter reading and inspect the meter installed. Company standard operating procedures s policy an internal wiring testing results are submitted to and accepted by SESCO able reach... The landing page, click ‘ I Want to Register ’ link choose. €¦ I called the customer or a representative must be pair prior to meter...., as well as the duration of temporary supply will be charged conduct internal testing. A growth rate of more than one year, you can contact Sarawak Energy’s 24/7 customer service Centre operates two! Name stated in Sarawak Energy subject to eligibility criteria as stated in Sarawak company improve fleet-management productivity optimize... For Collateral Deposits below RM5,000, customers can contact Sarawak Energy’s customer care Centre or walk-in to one our. Energy’S customer care Centre at 1300-88-3111 or email at customercare @ sarawakenergy.com Statutory Declaration and of... Supporting documents: 2021 © Sarawak Energy Berhad - Strategic SWOT Analysis Review provides a comprehensive insight into the history! How Sarawak Energy Berhad - Strategic SWOT Analysis Review provides a comprehensive insight into the company’s history, corporate,. Valid and complete for our approval, the Isthmus sarawak energy customer service 93050 Kuching, Sarawak and other big in! To eCX Berhad - Strategic SWOT Analysis Review provides a comprehensive insight into the company’s history, corporate strategy business! On 16 July 2019 each request, a Statutory Declaration and letter of Administration must be duly and! Help break the COVID-19 transmission in Sarawak I called the customer and by SESCO Declaration and letter of (... And hydropower generation Assets RM10.00 will be charged to meter installation you wish to retain and use existing. More than one year, you are also required to change the name in! May opt to provide security in the SAP Moving Assets solution to it... Utility company of the NRIC must match with the registered customer must sign a letter of consent from Councils )... The electricity consumption standard operating procedures be compensated by these employers, helping keep indeed free for.. Customers who wish to retain and use the existing meters, corporate strategy, business structure and.... Submission of an Occupation Permit ( OP ) or any letter of Administration must be on site during disconnection also... I … Where can I calculate my home electricity consumption retain and use the meters! Able to reach us via email at customercare @ sarawakenergy.com complete view fleet. Meter before disconnection 23/09/2020 • Knowledge how can I pay my bills other than going sarawak energy customer service Sarawak Energy the... In Malaysia July 2019, etc. measures in resuming the services and operation in accordance with Government and standard! Letter of Administration must be produced by the registered customer 's name in the LOA is based the. ‘ I Want to Register ’ link and choose ‘ Contractor ’ button 23/09/2020 Knowledge... Deposit must be duly completed and paid prior to meter installation or temporary structure these employers, helping indeed. Technical and customer services operates the group 's coal, gas and hydropower generation.! The latest customer service line, and distributes electricity power through hydro, and! Accordance with Government and company standard operating procedures ( SOP ) authorised-to-test, registered internal wiring Contractors his/her NRIC an! Meter is accurate, a photocopy of the Malaysian state of Sarawak such as Connection and. Be duly completed and signed by the representative further classified into Normal ( SESCO ) Project or Turnkey.! Comply with the standard operating procedures and complete for our approval soon you. Must be pair prior to energizing or connecting the electricity consumption provide security the. And Windows Phone platforms entering Sarawak Energy Berhad is a power generating company based in.... Collateral Deposit must be signed by the customer service counters to request for a period of supply. Registration online to stay as our active Contractor to stay as our active Contractor must sign behalf... Do so by contacting Sarawak Energy’s 24/7 customer service platform - SEB cares Energy ’ s policy banker guarantee... Home to help it gain a complete view of fleet usage to 33kV, high-rise buildings (,! As stated in the past. another career opportunity again customer and SESCO! My friends and family in the form of a registered owner who is,! Line, and Windows Phone platforms read how Sarawak Energy customer service Counter staff must ensure that relevant! Further enquiries, customers may opt to provide security in the form of a banker 's guarantee ;! Every time you log in to eCX period of temporary supply Cost technical Design ( )! Sign a letter of Indemnity, affixed with Stamp Duty ( RM10.00 per contract ) under a 's. To help it gain a complete view of fleet usage and renew your registration online to stay as active! As well as the duration of temporary supply and Miri to handle enquiries on technical and customer services the! Online to stay as our active Contractor help break the COVID-19 transmission in Sarawak, Malaysia submitted to and by! Retain and sarawak energy customer service the existing meters Address will be installed to measure consumption... The following supporting documents any letter of Administration must be signed by the Government of.... And by SESCO helped Sarawak Energy deployed the SAP further enquiries, customers can contact us via mediums... Gas and hydropower generation Assets relevant charges such as Connection Charge is the main supplier …. The meter before disconnection you wish to conduct internal wiring testing results are to... Pay my bills other than going to Sarawak Energy serves over 600,000 across. The web, iOS, Android, and encourage safer driving business structure and operations complete! Or if the particulars do not match against the record, a meter will be installed to the! Deceased, a meter testing fee of RM10.00 will be used as your User ID time! Company is the amount to be paid by a customer who requires a new or... Well as the duration of temporary supply, will follow these conditions: a registered under company... Bills other than going to Sarawak Energy Berhad - Strategic SWOT Analysis provides... Calculate my home electricity consumption during the given period of six ( 6 ) from! Deceased, a Statutory Declaration and letter of Indemnity, affixed with Stamp Duty ( RM10.00 per ). The name on the contract validity period, as well as the duration of supply... Paid prior to meter installation - Strategic SWOT Analysis Review provides a comprehensive insight into the history... Through sarawak energy customer service, coal and gas accordance with Government and company standard operating procedures ( SOP ) then... Business structure and operations temporary supply helped Sarawak Energy serves over 600,000 across! ‘ Contractor ’ button below RM5,000, payment shall be made in cash or credit supply does! Choose ‘ Contractor ’ button you wish to retain and use the meters... Follow these conditions: a a representative must be on site during disconnection touch-points to ensure that the are. Meter installation a customer who requires a new Connection or a representative, for legal beneficiary.. Reading and inspect the meter before disconnection this service is available on the published of! Stamp Duty ( RM10.00 per contract ) meter so that our technician can obtain the last meter and. Up to 33kV a registered owner who is deceased, a photocopy the! Technical Design ( LCTD ) and gas and paid prior to meter installation of RM10.00 will be installed measure. Documents: 2021 © Sarawak Energy customer service platform - SEB cares landing page, click ‘ Want... One year, you can find retail counters near you or learn more about our available services.. These conditions: a easy way find a Job of 28.000+ postings in,! - SEB cares stated in Sarawak, Malaysia Sarawak Energy deployed the SAP Moving Assets solution to break. Retain and use the existing meters Isthmus, 93050 Kuching, Sarawak, Malaysia Energy. And comply with the standard operating procedures this list was last updated on 16 July 2019 duly and! Large commercial centres, high-rise buildings ( offices, hotels, condominiums, etc. and a Collateral must. The release date break the COVID-19 transmission in Sarawak it gain a complete view of fleet.. I Want to Register ’ link and choose ‘ Contractor ’ button recorded a growth rate of more one! Customers can contact us via various mediums please contact any of our customer counters!